Best Practices in Harvard Labs

There are many examples of successful conservation projects in Harvard laboratory buildings. The table below is a central place for documenting these projects and sharing success stories across the University.  More detailed information about each project, including any materials, cost/savings evaluations, and vendor information, will be available in a separate spreadsheet soon.

Please email any additional projects that you would like to include on this website to Gosia Sklodowska or Jaclyn Olsen, or fill out the Lab Conservation Project Form.

Yr
Project Contact
LIGHTING
HMS
06
Lighting upgrade and sensors in labs (WAB) C Campbell
HSPH
05
Lighting & controls (labs and public areas) D Beaudoin
FAS
07
Lighting audits (Chem) J Connors, M Paterno, G Sklodowska
 
HVAC
FAS
07
Lower ACH in animal labs P Brown, Ch Trent, J Faria
HMS
05/06
Winter break & night set-backs in lab bldgs C Campbell
FAS
06
Hood setbacks in EPS building P Rausa
HSPH
 
Night set-backs in lab bldgs D Beaudoin
   
EQUIPMENT
FAS
06
Occ sensors on fume hoods (Bauer) J Costello, Ch Trent
HSPH
04
Air Sentry low flow hoods D Beaudoin
HSDM
05 
Sensors on fume hoods to reduce FV from 100 to 60 fpm (REB)  
HMS
  05 Sensors on fume hoods to reduce FV from 100 to 60 fpm (NRB) C Campbell
   
BEHAVIOR
Long
06
CFL switch-out HMS/HSPH/HSDM J Olsen
HMS
05/06
Fume hood sash management (Bio/Chem) J Olsen
FAS
05/06/07
Fume hood sash management (Chem) G Sklodowska
All
05/06/07
Campus Sustainability Pledge 05 J Olsen, G Sklodowska
All
07
Resource Efficient Lab Equipment Database J Olsen, G Sklodowska
All
07
Lab equipment management J Olsen, G Sklodowska
       
COMMISSIONING 
FAS
06
Commissioning of EPS building L McNeil
HSPH
05 
Retro-commissiong HSPH campus D Beaudoin
HSPH
now
Continuous commissioning project – metering and real time tracking D Beaudoin
       
CUSTODIAL
HMS
06
Green Cleaning Program  - in progress B Christiano, J Olsen