Info & Links
- Labs for the 21st Century
- Labs21 Environmental Performance Criteria (EPC)
- Labs21 Best Practices
- U.S. Green Building Council
- Lab Design News
Got Questions About This?
Contact:
- Claire Berezowitz,
Longwood Green Campus Program Coordinator - Gosia Sklodowska, FAS Green Program Manager
Best Practices in Harvard Labs
There are many examples of successful conservation projects in Harvard laboratory buildings. The table below is a central place for documenting these projects and sharing success stories across the University. More detailed information about each project, including any materials, cost/savings evaluations, and vendor information, will be available in a separate spreadsheet soon.
Please email any additional projects that you would like to include on this website to Gosia Sklodowska or Jaclyn Olsen, or fill out the Lab Conservation Project Form.
Yr |
Project | Contact | |
|---|---|---|---|
| LIGHTING | |||
HMS |
06 |
Lighting upgrade and sensors in labs (WAB) | C Campbell |
HSPH |
05 |
Lighting & controls (labs and public areas) | D Beaudoin |
FAS |
07 |
Lighting audits (Chem) | J Connors, M Paterno, G Sklodowska |
|
HVAC |
|||
FAS |
07 |
Lower ACH in animal labs | P Brown, Ch Trent, J Faria |
HMS |
05/06 |
Winter break & night set-backs in lab bldgs | C Campbell |
FAS |
06 |
Hood setbacks in EPS building | P Rausa |
HSPH |
Night set-backs in lab bldgs | D Beaudoin | |
| EQUIPMENT | |||
FAS |
06 |
Occ sensors on fume hoods (Bauer) | J Costello, Ch Trent |
HSPH |
04 |
Air Sentry low flow hoods | D Beaudoin |
HSDM |
05 |
Sensors on fume hoods to reduce FV from 100 to 60 fpm (REB) | |
HMS |
05 | Sensors on fume hoods to reduce FV from 100 to 60 fpm (NRB) | C Campbell |
| BEHAVIOR | |||
Long |
06 |
CFL switch-out HMS/HSPH/HSDM | J Olsen |
HMS |
05/06 |
Fume hood sash management (Bio/Chem) | J Olsen |
FAS |
05/06/07 |
Fume hood sash management (Chem) | G Sklodowska |
All |
05/06/07 |
Campus Sustainability Pledge 05 | J Olsen, G Sklodowska |
All |
07 |
Resource Efficient Lab Equipment Database | J Olsen, G Sklodowska |
All |
07 |
Lab equipment management | J Olsen, G Sklodowska |
|
COMMISSIONING |
|||
FAS |
06 |
Commissioning of EPS building | L McNeil |
HSPH |
05 |
Retro-commissiong HSPH campus | D Beaudoin |
HSPH |
now |
Continuous commissioning project – metering and real time tracking | D Beaudoin |
CUSTODIAL |
|||
HMS |
06 |
Green Cleaning Program - in progress | B Christiano, J Olsen |
