SCHLESINGER LIBRARY

FEBRUARY 2005

LEED-NC CERTIFIED

schlesinger drawing schlesinger exterior

 

Summary
 

The renovation of the 24,000 square foot Arthur and Elizabeth Schlesinger Library at the Radcliffe Institute for Advanced Study was completed in February 2005. Schlesinger is one of a group of buildings at the head of the historic Radcliffe Yard. Built in 1907, the existing masonry structure consists of four stories above grade, a basement, and a small unoccupied attic.

 

The building was originally home to the Radcliffe College Library. In 1967, after the Library was moved to a new building, the existing building became a research library for scholarship on the history of women in America.  The building suffered from several renovations that obscured or obliterated the character of the building, and made the structure unwelcoming and difficult to navigate. The renovation was designed to facilitate its use by librarians and patrons while meeting the needs of a modern special collections library and restoring some of the building's character.

 

The renovation reclaimed some of the building's original amenity and grace through careful protection of the original pieces of the building. This included minimizing changes to the building envelope, with the only significant changes being the addition of an accessible ramp to the main entrance and addition of interior storms to the windows. The few original interior elements, including a stained glass window and marble stair, were protected and restored. One highlight was restoring part of the second floor to a double-height daylit reading space.

 

Many of the decisions made to protect the collections were also sustainable choices. New material selection was based on function as well as minimizing off-gassing to protect the occupants and the collection. In addition, the mechanical system was carefully designed to minimize the chance of mold growth and particulate contamination while improving energy efficiency. Commissioning was also critical throughout the design and construction process, given the complex mechanical system and requirements to maintain proper temperature and humidity throughout the building.

 

From the outset a major goal of the project was to minimize construction waste. Using a number of avenues, the project was able to recycle most of the construction waste, and redistribute and donate a large portion of the furniture, cabinets, fixtures, and doors. This work, done in conjunction with Harvard University and the Institutional Recycling Network, allowed for a recycling rate of over 90%.

 

 

Building Highlights

  • Renovation of a 1907 building – 100% of building shell and elements preserved
  • Open space preserved; tree shading reduces the heat island effect
  • Energy use reduced by 25% over code
  • 91% of construction wasted diverted from landfills
  • Outdoor views for over 90% of spaces
  • Green cleaning contract signed

 