TEMPLATES |
The templates linked below are guidelines only and should be modified to suit each particular project. LEED EAc1 requirements have changed from version 2.1 to 2.2, so be sure to use the correct methodology, as described in the LEED-NC Reference Guide, and to use correct templates below. For LEED-NC v. 2.2 projects, see the LEED Reference Guide, version 2.2, pages 187 - 191 for examples. For LEED-NC 2.1 projects, See the Harvard Energy Models for examples of completed comparisons.
LEED-NC version 2.2: Performance Rating Method LEED Online EAc1 Sample Letter Template
(Includes templates for: General Building Modeling Information Base Case versus Design Case Comparison Baseline Performance: Baseline Performance Rating Table and End-Use Energy Summary Percentage Improvement: Performance Rating Table and End-Use Energy Summary)
LEED-NC version 2.1: Energy Cost Budget Method Base Case versus Design Case Comparison Energy Model End-Use Summary and Comparison Template
|
Updated: Tuesday, November 6, 2007 12:11 PM


